27.3.10
26.3.10
Ready to be nailed down.
These hardwood flooring are finally ready to be installed. They are currently laid out in the room, getting ready to be nailed down! We have chosen to use a warmer colour for the upper floor of the house while a more chocolate color for the lower. Pictures of those will be up on this blog once our second floor is complete. Thanks for your patience.
25.3.10
24.3.10
23.3.10
Here they are.
22.3.10
Tiles are up.
The walls are slowly covered up in tiles. However, we have to extra patient when working with this type of tile due to its huge size. To avoid any misalignment or the tiles from falling down, we can only put up six pieces per day.
The floor tiles for the bathroom will be arriving home tomorrow. More updates on that soon!